这已经是最后一期了哦!

我知道了

2025年04月30日

上一期 下一期
英文三版:NEWS
2025年04月30日

ZF’s laboratory project in Anting begins reconstruction

阅读量:242 本文字数:208

Hu Xindong and Ye Fengting

 

ZF LIFETEC has begun the sec-ond phase of reconstruction at its headquarters in Anting Town, with operations set to resume by the end of the year.

The first part of the new headquarters was finished and became operational in October. It has a total floor area of approximately 19,000 square meters and houses major departments such as R&D and sales, which support ZF’s business in Asia Pacific and around the world.

The second phase entails re-constructing a laboratory at the headquarters. The new facility, which covers 3,500 square meters, will in-clude 12 testing zones to suit the testing requirements in core devel-opment for ZF’s car occupant safety system products.

Among them is a crash simulation facility, which will be outfitted with a world-class servo-hydraulic sled to aid in product development.

ZF Group, a global leader in auto-motive parts supply and technology, established a presence in Anting in 1997. In March 2024, its Passive Safety Division was renamed ZF LIFETEC, and its Asia-Pacific headquarters was established in Jiading.

Recently, ZF has expanded its business in Anting, boosting the company’s growth and enhancing Jiading’s automotive industry.

 

The ZF LIFETEC building in Jiading’s Anting Town — Hu Xindong







您当前使用的浏览器版本过低,可能导致部分功能不能正常使用。
建议使用 IE9及以上版本,或 Firefox ChromeOpera等浏览器。谢谢!
现在升级 稍后再说